Where engineering meets intelligence

Group i2R blends design innovation, project control, and sectoral expertise to shape the infrastructure of tomorrow.

Trusted by leading infrastructure organizations across India

300+
Projects Handled
1662+ KM
Design Services
60%+
Claims Success Rate
10+
Years of Experience

About Group i2R

Group i2R delivers comprehensive solutions to complex infrastructure execution challenges, fostering sustainable development and operational excellence.

Comprising i2R Consulting and its subsidiaries, Druta Designs and i2R Rail Infra Systems, our group offers a fully integrated suite of professional services tailored to the needs of major infrastructure projects.

Our expertise spans the complete project lifecycle, beginning with Design Management and Contracts Management, and extending through Project Management - encompassing Planning & Scheduling, Delay Analysis, and Claims Management.

We maintain a proven track record across diverse sectors, with capabilities that cover roads and highways, metros, railways, airports, industrial townships, and power projects.

With an unwavering commitment to efficiency, precision, and accountability, Group i2R ensures every project is delivered to the highest standards - supporting our clients' objectives and driving infrastructure progress.

Group i2R Holistic Project Lifecycle
Group i2R Core Values
i2R Consulting Pvt. Ltd. Logo

i2R Consulting Pvt. Ltd.

At i2R Consulting, we deliver comprehensive project and contract management solutions with a focus on excellence in infrastructure execution. Our core expertise lies in roads and highways, complemented by extensive experience across airports, power projects, and industrial townships. Driven by our robust Contract Management System (CMS), we ensure seamless project delivery through full visibility, structured documentation, and real-time collaboration - empowering clients to achieve their objectives efficiently and transparently.

Our Services:

Design Management

Seamless integration of design and execution, powered by our design subsidiary, Druta Designs.

Contracts Management

Expert drafting, administration, and management of contracts to protect client interests and ensure regulatory compliance.

Planning & Scheduling

Utilization of advanced platforms such as Primavera and MS Project for precise planning, monitoring, and project control.

Delay Analysis

Forensic identification and analysis of delays to reinforce contractual claims and defenses.

Claims Management

End-to-end preparation and resolution of contract claims, supporting clients in securing fair outcomes.

Expert Witness Services

Provision of credible, structured expert testimony for effective dispute resolution.

Technical Audits

Systematic audits to validate compliance, enhance quality, and assure process integrity.

With a commitment to accountability, precision, and innovation, i2R Consulting enables infrastructure projects to move forward with confidence and measurable impact.

i2R Consulting Pvt. Ltd. Services Overview 1i2R Consulting Pvt. Ltd. Services Overview 2
Druta Designs Pvt. Ltd. Logo

Druta Designs Pvt. Ltd.

Druta Designs Pvt. Ltd. is the dedicated design and engineering arm of i2R Consulting, driving innovation, sustainability, and technical excellence across infrastructure sectors. As the design powerhouse of the i2R Group, Druta delivers high-quality solutions right from project inception to completion, blending creative vision with engineering precision.

While design remains at the core of Druta's expertise, the company operates both as an independent design consultancy and as an integrated partner to i2R Consulting and i2R Rail Infra Systems. This flexible engagement model ensures that every project benefits from technically sound designs, seamless coordination, and smooth integration between design, execution, and delivery.

Our Services:

Feasibility study

We deliver concise, integrated feasibility studies and design solutions for infrastructure projects—serving both independent clients and the i2R Group throughout the project lifecycle. Our approach includes assessment of traffic flows and vehicle movement, strategic recommendations for project alignment and design, photographic and impact documentation, facility and resource availability review, environmental and social qualification, and preparation of consultation-ready reports. This ensures every project advances with technical clarity, sustainability, and stakeholder confidence.

Detailed Project Report (DPR)

Our DPRs serve as comprehensive documents for investment, decision-making, planning, and execution—adopting an agile approach for stakeholders. Each DPR includes population data of connected habitations, hydraulic data for cross drainage design, complete topographical surveys and Digital Terrain Models using DGPS and Auto Levels, detailed mapping of natural and manmade features (such as electrical poles, pipelines, buildings, water bodies, and bridges), and the survey of crossroads as per relevant standards, ensuring all aspects needed for project approval and implementation are thoroughly addressed.

Pre-Bid

We provide end-to-end pre-bid engineering and cost estimation services to help clients succeed at every stage of bidding. This includes tendering assistance, bidding support, thorough review of RFQ/RFPs, comprehensive analysis of technical requirements for bid submissions, cost strategizing and BOQ preparation, value engineering for precise project estimation, as well as continuous support and technical guidance through bidding and contract finalization.

Detail Engineering

We deliver detailed engineering solutions focused on design optimization, value engineering, and user safety. Our services span operational readiness and transition management, turnaround management, construction and procurement oversight, project management and monitoring, total quality management, safety and environmental management, and the development of efficient exit strategies—ensuring seamless project execution from start to finish.

By combining strong design leadership with multidisciplinary collaboration, Druta Designs ensures that every infrastructure project achieves design excellence, operational efficiency, and sustainable outcomes-from concept through completion.

Druta Designs Pvt. Ltd. Services Overview
i2R Rail Infra Systems Pvt. Ltd. Logo

i2R Rail Infra Systems Pvt. Ltd.

i2R Rail Infra Systems Pvt. Ltd, focused on railways and metro infrastructure, brings sector-specific expertise for large, multi-stakeholder projects. Our Contract Management System (CMS) ensures systematic handling of technical, contractual, and operational complexities unique to rail and urban transit projects.

At i2R Rail, we align our expertise with the growing market demands of the Railway and Metro sectors. With India's rapid expansion in rail infrastructure, we provide specialized services in the following key areas:

Our Services:

Design Management

In collaboration with Consultants & Design teams, ensuring design-build alignment for complex metro and rail systems.

Contracts Management

Managing contracts with precision across large-scale railway and metro works.

Planning & Scheduling

Robust scheduling and monitoring for tunnelling, track-laying, signalling, and system works.

Delay Analysis & Claims Management

Specialized in handling disputes and delay scenarios common in rail and metro projects.

Interface Management

Ensuring seamless coordination between multiple stakeholders, contractors, and system providers.

Expert Witness Services

Providing evidence-based support in dispute resolution.

Technical Audits

Conducting audits for compliance with international standards and authority requirements.

Signaling & Telecommunication

Specialized in handling disputes and providing expert support in advanced rail communication systems.

i2R Rail Infra Systems Pvt. Ltd. Services Overview

Unified Value of Group i2R

Group i2R unites specialized expertise across the infrastructure and transport sectors to deliver complete project solutions. Druta Designs leads in providing comprehensive detailed design services—both as an independent specialist and as a strategic partner for i2R Consulting and i2R Rail Infra projects when advanced design input is required. In parallel, i2R Consulting and i2R Rail offer robust capabilities in contract management, project management, and claims management, ensuring disciplined project delivery, effective risk mitigation, and strategic contract administration.

By integrating these strengths, Group i2R creates a seamlessly connected ecosystem that offers clients precision in design, streamlined project and contract management, and expert claims resolution. This synergy enables stakeholders to achieve efficient execution, minimized risk, and optimal outcomes at every stage of the project lifecycle.

Unified Value of Group i2R

Our Team

We are a collective of engineers, planners, designers, and contract specialists with decades of combined experience across India and overseas. Guided by seasoned leadership and supported by young, dynamic professionals, the Group i2R team blends technical depth with innovative thinking to deliver real value to clients.

Leadership Team

Mr. Krishna Nistala

Mr. Krishna Nistala

Founder & Managing Director

Mr. Krishna Nistala is an engineer, strategist, and entrepreneur with over 30 years of experience delivering complex infrastructure programs across highways, rail, metro, and urban development. He founded i2R Consulting Pvt. Ltd. in 2015 with a clear mission: to help key execution stakeholders — particularly contractors and developers — achieve greater clarity, control, and predictability in project execution through disciplined engineering, contract intelligence, and decision support.

Under his leadership, i2R has supported over 250 infrastructure projects, building a strong reputation for resolving challenges spanning disputes, delays, cost overruns, and execution bottlenecks. He is driving i2R's evolution into a tech-enabled infrastructure solutions company, leading the development of platforms such as TractusIQ™, SentinelIQ™ (Bridge Health Monitoring System, BHMS), and advanced cost-to-completion and decision-support tools, positioning i2R at the intersection of engineering expertise and digital innovation.

LinkedIn Profile
Dr. Hareesh Boinepelli

Dr. Hareesh Boinepelli

Chief Technology Officer

Dr. Hareesh Boinepelli is a senior technology leader with over 25 years of experience architecting and scaling enterprise-grade digital platforms across on-premise and cloud environments. With deep expertise in large-scale systems, product engineering, and global technology operations, he has led mission-critical platforms and high-performance engineering teams across banking, data analytics, and technology-driven enterprises.

At i2R, Dr. Boinepelli leads the company's technology strategy and product engineering initiatives through the InfraIQ Lab, translating complex infrastructure and field challenges into scalable, deployable digital solutions. He owns the architecture and engineering execution for platforms including TractusIQ™, SentinelIQ™ (BHMS), and digital project management tools for infrastructure execution, establishing enterprise-grade standards for security, performance, reliability, and scalability, while building teams capable of delivering robust, market-ready products for owners, engineers, contractors, and developers.

LinkedIn Profile
Mr. Ramlal

Mr. Ramlal Chunduri

Director – Contracts & Project Delivery

Mr. Ramlal brings over 30 years of experience in infrastructure consulting, contract management, and execution oversight across India, Oman, and the UAE. A structural engineer by training with advanced qualifications in project management and alternative dispute resolution, he has led major assignments in highways, expressways, bridges, and complex, multi-stakeholder infrastructure programs.

Before joining i2R in 2018, he held senior leadership roles at global consulting firms including Parsons and Egis, serving as Regional Director, General Manager (Contracts), and Resident Engineer on marquee projects. At i2R, Mr. Ramlal plays a pivotal role in strengthening project delivery discipline, contract governance, and claims management, bringing deep field insight and contractual rigor to support contractors and developers in achieving successful and defensible project outcomes.

LinkedIn Profile
Mr. Srinivasa Sarma

Mr. Srinivasa Sarma Bhallamudi

Director – Rail & Metro Systems

Mr. Srinivasa Sarma brings over 32 years of experience in Indian Railways and Metro Rail systems, including more than 20 years dedicated to MRTS and metro projects across India. A transportation engineer with a strong technical foundation, he has led critical assignments covering business development, project management, interface coordination, track works, procurement, design review, and contract administration for major national rail programs.

Prior to joining i2R, Mr. Sarma held senior leadership roles with Egis and Indian Railways, serving as Senior Track Expert, Interface Expert, Project Coordinator, and Head of Rail Division. At i2R, he leads the Rail division, bringing deep expertise in interface management, systems integration, risk management, and cross-functional coordination to support rail owners, contractors, and developers in delivering complex metro and railway projects efficiently and reliably.

LinkedIn Profile
Dr. Pattabhiram

Dr. Pattabhiram Yegulla

CEO, Druta Designs

Dr. Pattabhiram is a senior transportation and highway engineering professional with over 30 years of experience spanning detailed design, project management, and construction supervision across India, the Middle East, and Africa. His expertise covers expressways, national highways, tunnels, marine structures, drainage systems, and large-scale multidisciplinary infrastructure projects.

He has held key technical and leadership roles including Design Director, Team Leader, Senior Highway Engineer, and Area Design Manager for government authorities, international consultants, and major concessionaires. His portfolio includes landmark assignments such as the Ganga Expressway DPR (1,047 km), Lusail Expressway, Qatar, multiple packages of the Nagpur–Mumbai Samruddhi Expressway, and several NHAI and state government projects. At i2R, he anchors design and engineering excellence, ensuring technical quality, constructability, and delivery reliability for contractors and developers.

LinkedIn Profile

International Presence

i2R is steadily expanding into international markets, anchored by its core strengths in design management, delay analysis, and contract management.

With an established presence in France, successful project experience in Bangladesh, and active engagements currently underway in Nepal, i2R brings cross-border expertise and practical insights to complex infrastructure programs. Our strong operational base in India further reinforces our ability to deliver on diverse and challenging assignments.

In India, we manage a wide spectrum of contract types - including EPC, HAM, BOT, and BOQ-based contracts - enabling us to support stakeholders across various procurement frameworks and delivery models.

Across these geographies, we provide comprehensive Contract Management, Project Management, Claims Management, and Technical Due Diligence services to Concessionaires, Contractors, and Investors.

Our primary focus lies in the Transport and Urban Infrastructure sectors, where our domain expertise and structured methodologies help clients navigate project complexities with clarity and confidence.

We work in close collaboration with our clients to support their project execution, operational requirements, and future investments - identifying critical issues early, addressing areas of concern effectively, and helping them minimise risk exposure throughout the project lifecycle.

Careers

At Group i2R, people are our greatest asset. We cultivate a culture of continuous learning, collaboration, and empowerment, where every team member is encouraged to grow and make meaningful contributions to infrastructure that shapes the future. If you are passionate about project delivery, design excellence, or driving innovation in infrastructure, we encourage you to explore a career with us.

Druta Designs

For opportunities in detailed design and engineering with Druta Designs, please send your resume to:

contact@drutadesigns.in

i2R Consulting & i2R Rail

For roles related to contract management, project management, or claims management with i2R Consulting or i2R Rail, please reach out at:

contact@groupi2r.com

Join us—be part of a team that delivers transformative solutions and builds tomorrow's infrastructure.

Strategic Partnerships

Inncircles Logo

Inncircles - i2R

Where i2R is a domain lead for the PlanisIQ™ (PMIS) application and its implementation.

IIIT Hyderabad Logo

IIIT Hyderabad

Sensor R&D for SentinelIQ™ (BHMS)

TekUncorked Logo

TekUncorked

AI fault detection, LVIOT platform

Partner With Us

At Group i2R, we believe that meaningful partnerships are the foundation for delivering excellence in infrastructure. With core expertise in Design Management, Contract Management, Project Management, and Claims Management, we support stakeholders across highways, railways, airports, power, and urban infrastructure.

We invite collaboration with professionals, consultants, and organizations who share our vision for smarter, safer, and more efficient projects. Whether you bring specialist technical knowledge, domain experience, or a passion for transformative engineering, partnering with Group i2R offers you the opportunity to contribute to projects that shape the future of infrastructure.

If you are interested in exploring collaboration opportunities, please share your credentials or CV with our team. All profiles received will be securely maintained in our data bank, and as and when relevant opportunities arise, we will reach out to initiate collaboration. Together, we can create enduring value for clients and communities, setting new standards in infrastructure project delivery.

Comprehensive Infrastructure Solutions

From design management to claims advisory, we provide end-to-end consulting services that drive project success and operational excellence.

01

Design Management

Powered by Druta Designs

We bring design intelligence to execution - ensuring every drawing, detail, and document aligns seamlessly on-site to reduce rework, control costs, save time, and elevate build quality.

We manage the complete design lifecycle - from feasibility and preliminary engineering to detailed design and as-built documentation. Our team ensures design optimization for cost, schedule, constructability, and sustainability.

Pre-bid design support
Value engineering
Interdisciplinary coordination
Compliance with technical and statutory requirements
Seamless integration of design intent with execution plans
Total length of design services: +1662 KM
02

Contracts Management

Our contract management expertise ensures compliance, clarity, and control across every stage - minimizing disputes, expediting resolutions, and protecting your project's financial health.

We provide end-to-end contracts management support across the entire project lifecycle - pre-bid, execution, and close-out. By aligning contract obligations with project realities, we help clients minimize disputes, protect commercial interests, and ensure contractual clarity for all stakeholders.

Contract drafting and review
Risk allocation
Compliance monitoring
Change management
Total Projects handled: >120
03

Planning & Scheduling

Our planning expertise converts complex project data into reliable schedules that drive predictability, efficiency, and control throughout execution.

We deliver strategic project management solutions that integrate planning, execution, monitoring, and control. By applying industry best practices and advanced project control tools, we ensure that projects are delivered on time, within budget, and to the required quality standards.

Schedule development
Progress tracking
Interface coordination
Risk mitigation
Cost control
Using Primavera P6 and MS Project
04

Delay Analysis

Our delay analysis brings precision to disruption - tracing causes, quantifying impacts, and supporting evidence-based, timely resolution.

Timely delivery is critical in infrastructure projects. We apply internationally recognized methodologies - such as Time Impact Analysis, Window Analysis, and As-Planned vs. As-Built - to identify causes, quantify impact, and allocate responsibility for delays in a structured, defensible manner.

Extension of Time (EoT) claims and defenses
Transparent allocation of responsibility
Proactive project control
Minimization of disputes
Evidence-based reporting
Using Primavera P6 and MS Project
05

Claims Management

Our claims management expertise delivers well-substantiated, defensible claims that protect your contractual rights and maximize entitlement recovery.

Our claims management services focus on early identification, accurate assessment, and effective resolution of potential claims. With expertise in documentation, contractual interpretation, and dispute resolution, we help clients strengthen their position while maintaining constructive relationships.

EOT (Extension of Time) claims
Prolongation claims
Disruption claims
Variations & Price Escalation claims
Claims preparation and defense
Success rate: >60% across various sectors
06

Dispute Resolution

Our Dispute Resolution management expertise in the construction industry is critical due to the complex, multi-party nature of projects involving owners, contractors, subcontractors, suppliers, architects, engineers, and insurers.

Disputes often arise from delays, cost overruns, defective work, payment issues, design errors, or force majeure events. Effective resolution minimizes project disruptions, controls costs, and preserves relationships.

Arbitration support
Adjudication assistance
Expert witness testimony
Dispute avoidance strategies
Contract claims preparation
Evidence-based reporting

Additional Specialized Services

Value Engineering

  • Druta Designs specializes in delivering focused Value Engineering solutions for infrastructure and transport projects. Our approach systematically evaluates design alternatives, construction methods, and project resources to maximize value—optimizing both performance and cost efficiency without compromising safety, quality, or sustainability.
  • We engage cross-disciplinary expertise to identify opportunities for innovation, reducing lifecycle costs and enhancing constructability while maintaining regulatory compliance and operational excellence. Through collaborative workshops and rigorous analysis, our team ensures that every proposed solution is technically sound, user-centric, and economically justified.
  • With Druta Designs' Value Engineering services, clients benefit from smarter engineering decisions, accelerated project delivery, and infrastructure outcomes that balance ambition with practicality.

Expert Witness Services

  • At i2R, we offer robust Expert Witness Services to support dispute resolution and litigation across the infrastructure and transport sector. Our seasoned professionals bring deep technical, contractual, and project management expertise to provide independent analysis, credible testimony, and clear documentation in complex cases involving highways, railways, airports, power, and urban infrastructure projects.
  • Our services include thorough forensic analysis, preparation of expert reports, evaluation of claims and project records, and delivery of evidence-based opinions for arbitration, adjudication, and court proceedings. We act as trusted partners for legal teams, contractors, employers, and consultants, ensuring that our insights and testimony stand up to the highest standards of scrutiny.
  • With i2R's Expert Witness Services, stakeholders can expect unbiased expertise, industry-leading knowledge, and a commitment to exceptional clarity and integrity throughout the dispute resolution process.

Technical Audits

  • i2R and i2R Rail provide rigorous Technical Audit services designed to ensure quality, compliance, and operational excellence in infrastructure and transport projects. Our expert teams conduct systematic reviews of engineering designs, project execution, construction methods, and contractual documentation—across highways, railway systems, urban infrastructure, and power projects.
  • Our audits encompass thorough verification of technical specifications and evaluation of contract adherence. We identify risks, recommend corrective actions, and deliver actionable insights to enhance project performance and ensure alignment with regulatory frameworks and industry best practices.
  • Through i2R's Technical Audit solutions, stakeholders gain confidence in project integrity, risk mitigation, and continuous improvement—setting the foundation for successful delivery and sustainable infrastructure.

Ready to Transform Your Infrastructure Project?

Let our expert team guide your project from conception to completion with proven methodologies and innovative solutions.

Markets We Transform

Deep expertise across critical infrastructure sectors, delivering innovative solutions that drive economic growth and sustainable development.

+1662 KM Design Services

Roads, Highways & Expressways

We support highway and expressway projects from detailed designs, drawings, planning, MIS, contract management, risk mitigation, schedule control, and claims advisory to ensure timely, cost-effective delivery.

Key Focus Areas:

National Highway Projects
Expressway Development
Bridge Construction
Detailed Design & Engineering

Services Offered:

Design Management
Contracts Management
Planning & Scheduling
Delay Analysis
Claims Management
Specialized Expertise

Railways & Metros

At i2R Rail, we align our expertise with the growing market demands of the Railway and Metro sectors. With India's rapid expansion in rail infrastructure, we provide specialized services ensuring seamless project execution, compliance, and efficiency.

Key Focus Areas:

Railway Infrastructure
Metro Rail Systems
Signaling & Telecommunication
Multi-stakeholder Projects

Services Offered:

Contracts & Claims Management
Project Planning & Scheduling
Delay Analysis
PMC & Technical Support
Interface Management
5000+ Acres

SEZ

We manage complex, multi-use infrastructure developments, such as Special Economic Zones (SEZs) that combine industrial, commercial, residential, and utility networks. Our integrated approach ensures seamless delivery across diverse project components.

Key Focus Areas:

Master Planning
Industrial Facilities
Utility Infrastructure
Environmental Compliance

Services Offered:

Design Management
Contract Management
Planning & Scheduling
Claims Management
2000MW+ Capacity

Power / Transmission

We provide comprehensive project controls, contract advisory, and technical support to meet stringent quality and regulatory requirements in the power sector.

Key Focus Areas:

Power Generation Plants
Transmission Lines
Renewable Energy Projects
Smart Grid Solutions

Services Offered:

Contract Management
Planning & Scheduling
Claims Management
Specialised Services

Airports

We assist in the contracts management, planning & scheduling, claims management, focusing on interface management, systems integration, and compliance with aviation standards.

Key Focus Areas:

Airport Development
Terminal Buildings

Services Offered:

Planning & Scheduling
Contract Management
Interface Management
Claims Management
Specialized Services

Buildings/Port/Irrigation

For specialized needs, we offer expert witness services, technical audits, and high-level advisory on complex technical matters. Our seasoned professionals bring independent, evidence-based insights to support dispute resolution, quality assurance, and strategic decision-making.

Key Focus Areas:

Expert Witness Services
Technical Audits
Quality Assurance
Strategic Advisory

Services Offered:

Expert Testimony
Independent Reviews
Compliance Audits
Dispute Resolution Support

Digital Solutions

At i2R, we are building digital solutions to address the evolving needs of highway infrastructure projects and modern infrastructure management.

Available

TractusIQ™

Domain Expertise + Workflow Automation

Contract correspondence software for contractor teams on road, expressway, railway, metro and MRT projects. TractusIQ™ turns letters, emails, notices and MoMs into one structured, traceable record, with first-cut drafts ready for your team to validate and issue externally.

Key Features:

Sort every letter into the right issue automatically
Link each letter to its clauses and reference chain
Track actions, notice periods and due dates
Prepare first-cut drafts for your team’s review
Keep EOT, change of scope and claim records ready
Currently live for EPC, HAM, BOT, TOT and Item Rate contracts

To know more on TractusIQ™, visit https://tractusiq.com/or drop an email to contact.tractusiq@groupi2r.com

Available

SentinelIQ™

BHMS · Bridge Health Monitoring System

Group i2R is developing a cutting-edge Bridge Health Monitoring System to deliver real-time structural insights. The system tracks fatigue, stress levels, and deterioration patterns, enabling stakeholders to plan timely maintenance interventions.

Key Features:

Real-time structural monitoring
Fatigue and stress level tracking
Deterioration pattern analysis
Predictive maintenance planning
Enhanced bridge safety
Extended asset lifecycle
Deployed Successfully

PlanisIQ™

PMIS · Project Management Information System

In collaboration with Inncircles

In collaboration with Inncircles, we are working on the Project Management Information System, where i2R contributes as the knowledge partner. This tool enhances project controls, improves transparency, and integrates seamlessly with major scheduling software.

Key Features:

Enhanced project controls
Improved transparency
Integration with scheduling software
Data-driven decision-making
Real-time project insights
Collaborative platform
Available

LVIoT®

Low Voltage IoT Platform

In collaboration with TekUncorked

Group i2R, in collaboration with TekUncorked, is enabling smarter, predictive and renewables-ready last-mile electricity networks. By combining sub-second IoT sensing and AI-driven grid intelligence with i2R's implementation expertise, we deliver real-time visibility, faster fault response, and improved asset reliability.

Key Features:

Sub-second IoT sensing
AI-driven grid intelligence
Real-time network visibility
Faster fault response
Loss reduction capabilities
Improved SAIDI/SAIFI metrics
Extended transformer life
Rooftop solar & EV hosting support

Intelligent Assistance, Powered by i2R

We are developing an advanced chatbot widget, seamlessly integrated with the ChatGPT API, to provide instant, reliable support to website visitors. Tailored with i2R's deep domain expertise in design, contracts, claims, and project management for large-scale infrastructure projects, this intelligent assistant will deliver accurate guidance, faster responses, and a superior user experience.

Capabilities:

  • • Instant query responses
  • • Domain-specific knowledge base
  • • 24/7 availability

Integration:

  • • Vector DB for i2R documents
  • • Contract case studies
  • • i2R-branded responses

Interested in Our Digital Solutions?

Learn more about how our digital tools can transform your infrastructure project management and monitoring capabilities.

Knowledge Centre

Explore our collection of articles, case studies, and industry insights that showcase our expertise and share valuable knowledge with the infrastructure community.

Loading latest buzz...

Our Clientele

We have had the privilege of partnering with a diverse portfolio of industry-leading clients across the infrastructure landscape — spanning highways, expressways, metros, rails, SEZs, and more.

Our expertise spans design management, contract management, and project management—including MIS reporting, delay analysis, and claims management. Our clientele comprises leading industry players who rely on us for strategic support across critical project delivery functions. We work closely with each client to provide tailored, effective solutions aligned with their specific requirements.

94

<₹500 Cr

Projects under ₹500 Crores

42

₹500-1500 Cr

Projects between ₹500-1500 Crores

6

>₹1500 Cr

Projects above ₹1500 Crores

Our Clients

Adani Transport Ltd.
Adani Transport Ltd.
GVK Transportation Pvt. Ltd.
GVK Transportation Pvt. Ltd.
Nagarjuna Construction Company (NCC)
Nagarjuna Construction Company (NCC)
Ramky Infrastructure
Ramky Infrastructure
KNR Contractors
KNR Contractors
IVRCL
IVRCL
Tata Projects Limited
Tata Projects Limited
Rapid Metro Gurgaon Limited
Rapid Metro Gurgaon Limited

...among others

Join Our Growing List of Satisfied Clients

Partner with Group i2R for your infrastructure projects and experience the same level of excellence that our clients have come to trust.

Investor Relations

Group i2R represents a compelling investment opportunity in India's rapidly expanding infrastructure sector. With specialized expertise, proven track record, and strategic growth initiatives, we deliver sustainable value to our stakeholders.

Strong Track Record

Over 10 years of consistent growth in the infrastructure consulting sector with 300+ projects successfully delivered.

Market Leadership

Recognized expertise across roads, railways, metros, airports, and power sectors with specialized subsidiaries.

Diverse Portfolio

Serving industry-leading clients across multiple infrastructure segments with proven results.

Sustainable Growth

Strategic expansion through subsidiaries and digital innovation platforms ensuring long-term value.

Key Performance Metrics

300+
Projects Delivered
1662+ KM
Design Services
60%+
Claims Success Rate
10+
Years of Experience
High
Client Retention
Pan-India
Market Presence

Our Business Units

i2R Consulting

Focus: Roads, Highways, Airports, Power, Industrial Townships

Strength: Core expertise in end-to-end project and contract management

i2R Rail Infra Systems

Focus: Railways and Metro Infrastructure

Strength: Sector-specific expertise for large-scale transit projects

Druta Designs

Focus: Design Management & Engineering

Strength: Design innovation and technical excellence across all sectors

Strategic Growth Initiatives

Digital Transformation

Development of AI-powered platforms (TractusIQ™, SentinelIQ™/BHMS, PlanisIQ™/PMIS, LVIoT®) for enhanced service delivery

Market Expansion

Growing presence across railways, metros, and renewable energy sectors

Strategic Partnerships

Collaborations with Inncircles and TekUncorked for technology integration

Capability Enhancement

Continuous investment in talent, technology, and domain expertise

Client Diversification

Expanding client base across public and private sector infrastructure projects

Sustainability Focus

Integration of sustainable practices and green infrastructure solutions

Interested in Investment Opportunities?

For investor inquiries, financial information, or partnership discussions, please reach out to us. Our team is committed to transparent communication with potential investors and stakeholders.

Contact Information

Email
Nisha.parikh@groupi2r.com

For investor relations inquiries

Phone
+91 40 2335 4277

Monday - Friday, 9:00 AM - 6:00 PM IST

Registered Office

8-2-601/1/B (Mega City 452)
Road Number 10, Banjara Hills
Hyderabad - 500034, India

Request Information

We welcome inquiries from institutional investors, strategic partners, and individuals interested in learning more about investment opportunities with Group i2R.

Company Overview & Financials
Schedule a Meeting
Growth Plans & Projections
Partnership Opportunities

Partner With Us – Submit Your Profile

We invite you to share your details and credentials with us. Please fill in the form below, and our team will get in touch with you.

Let's Discuss Your Next Project

Ready to transform your infrastructure vision into reality? Get in touch with our experts for a consultation tailored to your specific needs.

Get In Touch

Our team is ready to discuss your project requirements and provide expert guidance for your infrastructure challenges.

Office Location

8-2-601/1/B (Mega City 452)
Road Number 10, Banjara Hills
Hyderabad, India

Phone

+91 40 2335 4277

Business Hours

Monday - Friday9:00 AM - 6:00 PM
Saturday - SundayClosed

Send us a Message